• Bottcher, J., Drexl, A., Kolisch, R., Salewski, F. (1996). “Project Scheduling Under Partially Renewable Resource Constraints”. Technicl report 398 Manuscipte aus den Instituten fur Betriebswritschaftslehre der Universitat Kiel.
  • Talbot, F.B (1982). “Resource-Constrined Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case”. Management Science, 38: pp. 1498-1509.
  • Pritsker, A. B., Watters, L. J. and Wolfe, P. M., Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 1969, 16, 93-108.
  • Patterson, J. H. and Roth, G., Scheduling a project under multiple resource constraints: A zero-oneprogramming approach. AIIE Transactions, 1976, 8, 449-456.
  • Carruthers, J. A. and Battersby, A., Advances in critical path methods. Opertional Research Quarterly, 1966, 17, 359-380.
  • Petrovic, R., Optimisation of resource allocation in project planning. Operations Research, 1986, 16, 559-586.
  • Demeulemeester, E. and Herroelen, W., New benchmark results for the resource-constrained project scheduling problem. Management Science, 1997, 43, 1485-1492.
  • Brucker, P., Schoo, A. nd Thiele, O., A branch-and-bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 1998, to appear.
  • Dorndorf, U., Pesch, E., Phan-Huy, T. A branch-and-bound algorithm for the resource-constrained project scheduling problem, Mathematical Methods of Operations Research 52(2000) 413-439.
  • Sprecher, A. , Drexl, A. (1995). Semi-Active, Active and non-delay Schedules for the Resource Constrained Project Scheduling Poblem, European Journal of Operational Research 80, 94-102.
  • Kolisch, R. (1996). Series and Parallel Resource Constrained Project Scheduling Method Revisited: Theory and Computation, European Jounal Of Operational Research 90,320-333.
  • Lee, J.K. and Y.D. Kim (1996), Search Heuristics for Resource Constrained Project Scheduling, Jounal of the Operational Research Society, 47, 678-689.
  • Kohlmorgen, U., H. Schmeck and K. Haase (1999), Experiences with Fine-Gained Parallel Genetic Algorithms, Annals of Opertions Reseach, 90, 203-219.
  • S. Hartmann, A competitive genetic algorithm for resource-constrained poject scheduling, Naval Research Logistics 49 (2002) 433-448.
  • J. Alcaraz, C. Maroto, A robust genetic algorithm for resource allocation in poject scheduling, Annals of Operations Research 102 (2001) 83-109.
  • S. Hartmann, A self-adapting genetic algorithm for project scheduling under resource constraints, Naval Research Logistics 49 (2002) 433-448.
  • Y.C. Toklu, Appliction of genetic algorithm to construction scheduling with o without resouce constraints, Candian Journal of Civil Engineeing 29 (2002) 421-429.
  • K.S. Hindi, H. Yang, K. Fleszar, An evolutionary algorithm for resource-constrained project scheduling, IEEE Transaction on Evolutionary Computation 6 (2002) 512-518.
  • J. Coelho, L. Tavares, Comparative analysis of metaheuicstics for the resource constrained project scheduling problem, Technical, report, Depertmant of Civil Engineering, Instituto Superior Tecnico, Portugal.
  • J. Gonclves, J. Mendes, A random key based genetic algorithm for the resource-constained poject scheduling problem. Technical report, Depatamento de Engenharia Universidade do Porto, 2003.
  • Goncalves JF, Beirao NC. Um algoritmo genetic baseado em chaves aleatorias para sequenciamento de operacoes. Revista Associacao Portuguesa Investigacao Opeacional 1999;19:123-37 (in Portuguese).
  • Mendes. J.J.M, Goncalves. J.F, Resende. M.G.C. A random key based genetic algorithm for the resource constrained project scheduling problem. Computers and Operations Research 36 (2009) 92-109.
  • P.R. Thomas, S. Salhi, A tabu search approach for the resource constrained project scheduling problem, Journal of Heuristics 4 (1998) 123-139.
  • T. Baar, P. Brucker, S. Knust, Tabu-search algorithm and lower bounds for the resource-constrained project scheduling problem, in: S. Voss, S. Martello, I. Osman, C. Roucairolb (Eds), Meta-heuristics: Advances and Trends in Local Search Paradigms for optimization, Kluwer Academic Publishers, Dordrecht, 1998, pp. 1-8.
  • R. Klein, Project scheduling with time-varying resource-constraints, International Journal of Production Research 38(16) (2000) 3937-3952.
  • K. Nonobe, T. Ibaraki, Formulation and tabu search algorithm for the resource constrained project scheduling problem, in: C.C. Ribeiro, P. Hansen (Eds.), Essays and Surveys in Metaheuristics, Kluwer Academic Publishers, 2002, pp. 557-588.
  • N. Pan, P. Wen Hsaio, K. Chen, A study of project scheduling optimization using Tabu Search algorithm, Engineering Applications of Artificial Intelligence 21 (2008) 1101-1112.
  • P. Tormos, A. Lova, A competitive heuristics solution technique for resource-constrained project scheduling, Annals of Operations Research 102 (2001) 65-81.
  • V. Valls, M.S. Quintailla, F. Ballestin, Resource-constrained project scheduling: A critical reordering heuristic, European Journal of Operational Research 149 (2003) 282-301.
  • V. Valls, F. Ballestin, M.S. Quintanilla, Justification and RCPSP: A technique that pays, European Journal of Operational Research 165 (2005) 375-386.
  • H. Zhang, X. Li, H. Li, F. Huang,”Particle swarm optimization-based schemes for resource-constrained project scheduling “, Automation in construction 14 (2005) 393-404.
  • R.M. Chen, C,L, Wu, C.M. Wang, Sh.T. Lo, “Using novel particle swarn optimization scheme to solve resource-constrained scheduling problem in PSPLIB “, Expert Systems with Applications, Volume 37. Issue 3, 15 March, 2010, pp. 1899-1910.
  • A. Ahmadi-Javid, P. Hooshangi-Tabrizi, An Anarchic Society Optimization Algorithm for a Flow-Shop Scheduling Problem with Multiple Transporters between Successive Machines, Proceedings of the 2012 International Conference Industrial Engineering and Operations Management Istanbul, Turkey, July 3-6, 2012.
  • Pritsker A. A.B., Watters, L. J., Wolfe, P. M., (1969). Multi project Scheduling with Limited Resources: A Zero-one Programming Approach, Management Science, 16, 93-108
  • Alvarez-Valdez, R. , Tamarit, J. M. , (1993). The Project Scheduling Polyhedron: Dimensions, Facts and Lifting Theorems European Jornal of Operational Research 67, 204-220
  • Mingozzi A. , Maniezzo, V. , Ricciardelli, S., and Bianco, L. (1998), An Exact Algorithm for Resource Constrained Project Scheduling Problem based on a new mathematical Formulation, Management Science, 44, 715-729.
  • J.Kennedy and R. Eberhart, “Particle swarn optimization”, Proceedings of the IEEE International Conference on Neural Networks (Perth, Australia) 1942-1948, 1995.
  • Kolisch, R. and A. Sprecher (1996), PSPLIB - A project scheduling library, European Journal of Operational Research,Vol. 96, pp. 205–216.
  • kolisch,R.,Sprecher,A.,Drexl,A,Charactrization and generation of a general class of resource-constrained project scheduling problems.Management science 41,pp.1693-1703.1995

[۴۳] Taguchi, G., 1986. Introduction to quality engineering. White Plains: Asian Productivity Organization/UNIPUB.
[۴۴] R. Kolisch und S. Hartmann (2006): Experimental Investigation of Heuristics for
Resource-Constrained Project Scheduling: An Update, European Journal of
Operational Research 174, 23-37, 2006.
پیوست ها

نتایج آزمایش الگوریتم ASO برای سری ۳۰ فعالیت

(( اینجا فقط تکه ای از متن درج شده است. برای خرید متن کامل فایل پایان نامه با فرمت ورد می توانید به سایت feko.ir مراجعه نمایید و کلمه کلیدی مورد نظرتان را جستجو نمایید. ))

 

نام فایل

موضوعات: بدون موضوع  لینک ثابت


فرم در حال بارگذاری ...